HYDROCARBON
TERMINAL

General cargo and fuel terminal located in San Luis Potosí that serves the industrial corridor in Central Mexico with the capacity to receive unit trains within a free trade zone (Strategic Enclosure).

STRENGHTS

  • - Public Terminal
  • - Land Reserved 85 Has (210 Acres)
  • - Neutral Operator (WATCO)
  • - Geography & Connectivity
  • -Free Trade Zone
  • - 2 – 3,000 M R & D Tracks
  • - Phase 1 – 120 Unloading Spots
  • - 3 Unit Trains Track Capacity
  • - Inside an Industrial Park (Security)
  • - On-site Testing Lab

FIRST PUBLIC TERMINAL TO GET STORAGE CRE PERMIT

STRATEGIC LOCATION

PHASE 1

TRANSLOADING IN OPERATION
  • Capacity from 39,600 Bbls to 70,000 Bbls per Day
  • Gasolines: Regular, Premium and Diesel
  • Fuel Additive Injection Capability

PHASE 2

TANK FARM STORAGE

Capacity from 300,000 BBLS by 1st Quarter of 2018 to 1.2 MILLION BARRELS by 2028

CONTACT

Av. Central no. 87 Parque Logistico

Eje 140 km. 4 Industrial Zone of SLP

Zip Code 78395

+52 (444) 161.50.10

info@wtcindustrial.mx

USA Office

+1 (832) 839 55 05

Seoul, Korea

+82 102 9473 102

Name

Phone

Email

Comments